Dry Fitting the Diaz Tower Stair

The stair treads have arrived from the midwest so the tower stair at the Diaz Farm Family Unit can be drive fit at long last.  After this dryfitting, the stair will be disassembled and hot dip galvanized (a procedure that should take two weeks).  The smaller members one sees in this shot are simply tack welded struts required for the initial assembly.
Previous
Previous

AIA Submissions are Posted

Next
Next

Panel Installation Starts on Maidman Residence