Michael Cobb 2/24/11 Michael Cobb 2/24/11 On Towers and Attics Read More Michael Cobb 2/6/11 Michael Cobb 2/6/11 Roof Panel Installation at Maidman Residence Read More Michael Cobb 1/21/11 Michael Cobb 1/21/11 Starting to Look at the Landscape Read More Michael Cobb 1/11/11 Michael Cobb 1/11/11 Maidman Residence Panel Installation Complete Read More Michael Cobb 12/24/10 Michael Cobb 12/24/10 Placing the Last Maidman Residence Wall Panel Read More Michael Cobb 12/18/10 Michael Cobb 12/18/10 Wrestling with Rain and Panels Read More Michael Cobb 12/4/10 Michael Cobb 12/4/10 Diaz Barn Refurbishing Read More Michael Cobb 11/4/10 Michael Cobb 11/4/10 Siding and Railing getting put in place Read More Michael Cobb 11/3/10 Michael Cobb 11/3/10 AIA Submissions are Posted Read More Michael Cobb 10/21/10 Michael Cobb 10/21/10 Dry Fitting the Diaz Tower Stair Read More Michael Cobb 10/18/10 Michael Cobb 10/18/10 Panel Installation Starts on Maidman Residence Read More Michael Cobb 9/19/10 Michael Cobb 9/19/10 The Maidman Residence Breaks Ground Read More Michael Cobb 7/2/10 Michael Cobb 7/2/10 Installation of the Tower Roof Read More Michael Cobb 6/18/10 Michael Cobb 6/18/10 Framing The Lookout Read More Michael Cobb 5/14/10 Michael Cobb 5/14/10 Agriboard Install Complete Read More Michael Cobb 5/8/10 Michael Cobb 5/8/10 Installation of the Steel Read More Michael Cobb 3/23/10 Michael Cobb 3/23/10 Addressing Openings Read More Michael Cobb 3/22/10 Michael Cobb 3/22/10 California and Architecture Read More Michael Cobb 3/18/10 Michael Cobb 3/18/10 Applying The Straps Read More Michael Cobb 3/5/10 Michael Cobb 3/5/10 The Tower is Next Read More Newer Posts Older Posts